Currently in your basket

Before proceeding to checkout you will need you to either login or create an account. Your items will remain in your basket.

Item Total
The Sewering of an Entire Town: How Chatham, Massachusetts is Planning to Gain Complete Control of Their Wastewater in order to Protect the Coastal Environment (26 words) $11.50
Navigating the Rapids: Overcoming Obstacles in the Rehabilitation of a 90-inch Sewer (13 words) $11.50
Technologies for CMOM Activities in Wastewater Collection Systems Preface (299 words) $0.00
Modernizing CSO Notification and Forecasting with Digital Tools (9 words) $11.50
Endocrine Disruptors: The Next Generation of Regulatory Concern? (132 words) $11.50
Benefits of a Comprehensive Infiltration and Inflow Removal Program (10 words) $11.50
Development and Calibration of a Lifecycle Cost Analysis Tool for Urban Green Infrastructure Systems in Philadelphia (17 words) $11.50
See it before we build it - How Fairfax County utilized high resolution 2-D Model to support a stormwater drainage improvement design to address 100-year flood! (27 words) $11.50
Tracking Down and Addressing Sources of PFAS in Influent Flows Through Strategic Collection System Monitoring and Targeted Outreach (19 words) $11.50
Monitoring Effectiveness of Sump Pump on Reducing Private Infiltration/Inflow (268 words) $11.50
Financing and Funding -- What Every Operator Needs to Know (2,013 words) $5.50
Achieving Consent Order Compliance: Comprehensive Mini-Basin Planning and Rehabilitation to Eliminate Sanitary Sewer Overflows and Reduce Hydraulic Overloads (19 words) $11.50
Net total: $120.50
VAT: $0.00
Gross total: $120.50
Payment info

When you click the checkout button, you will be redirected to a secure Paypal page where you can either pay using an existing Paypal account, or pay by card without a Paypal account.